| | #11 |
| jeef | They probably got some work out of that and are using an excuse to postpone your job. |
| | |
| | #12 |
| Slacking off in the house Join Date: Aug 2007 Location: In IN
Posts: 217
Rep Power: 2 ![]() | Wednesday for sure. She just called again.
__________________ 1927 2200 sq feet 3 story renovation project. Done Washing Machine - 10.27.07 Windows Install - 02.13.08 (New) Gas Oven - 11.22.08 Needs to be Done Put in the (new) dryer Uh... Alot more. |
| | |
| | #13 |
| Slacking off in the house Join Date: Aug 2007 Location: In IN
Posts: 217
Rep Power: 2 ![]() | Wow, what a difference windows without panes missing makes. The furnace has 30-40 minutes before it kicks on again instead of every 10-20 minutes. I can't wait to get the new front door/glass screen door for the main entrance. Pictures will be up tomorrow or sunday for sure.
__________________ 1927 2200 sq feet 3 story renovation project. Done Washing Machine - 10.27.07 Windows Install - 02.13.08 (New) Gas Oven - 11.22.08 Needs to be Done Put in the (new) dryer Uh... Alot more. |
| | |
| | #14 |
| Administrator Join Date: Aug 2007 Location: Central CT Age: 28
Posts: 432
Rep Power: 10 ![]() | you got them all done?
__________________ 1997 2050sqft Split Level ![]() |
| | |
| | #15 |
| Slacking off in the house Join Date: Aug 2007 Location: In IN
Posts: 217
Rep Power: 2 ![]() | All but four. There is a picture window by the stairs and in the dining room. The window above the sink in the kitchen and the main bathroom window were not done. But all the major windows were done, including the two with broken panes. Let me tell you, what a huge difference.
__________________ 1927 2200 sq feet 3 story renovation project. Done Washing Machine - 10.27.07 Windows Install - 02.13.08 (New) Gas Oven - 11.22.08 Needs to be Done Put in the (new) dryer Uh... Alot more. |
| | |