| | #1 |
| Slacking off in the house Join Date: Aug 2007 Location: In IN
Posts: 217
Rep Power: 2 ![]() | I've been in this house a little over a year and a half and I finally decided to put some weather stripping around the two sides of my front door... which didn't have any... that was effective, anyway. I did the top 2/3rds of the door and the top edge, with the bottom 1/3rd of the door needing to have the old stuff removed (it's some shitty piece of metal tacked on and I don't have a hammer here for whatever reason). I can feel the air still coming in on the bottom 1/3rd of the door... yet nothing on the top. 20' of weather stripping for under 2 bucks, gotta love it.
__________________ 1927 2200 sq feet 3 story renovation project. Done Washing Machine - 10.27.07 Windows Install - 02.13.08 (New) Gas Oven - 11.22.08 Needs to be Done Put in the (new) dryer Uh... Alot more. |
| | |
| | #2 |
| Administrator Join Date: Aug 2007 Location: Central CT Age: 28
Posts: 432
Rep Power: 10 ![]() | yeah, i'm due to get the stripping out as well. thanks for reminding me.
__________________ 1997 2050sqft Split Level ![]() |
| | |
| | #3 |
| General Contractor Join Date: Aug 2007 Location: Richmond, VA Age: 25
Posts: 230
Rep Power: 2 ![]() | Well atleast your doing something about it, my house leaks like crazy around the doors and I swear the walls have no insulation. What ever temperature it is outside, it is the same in the house. Thank you Mr. Fireplace!! Wood=Cheap Heat. Off topic, did you ever figure out what to do with your garage doors?
__________________ WWW.CandlewoodConstruction.Net CandleWood Construction 5805 Staples Mill Rd. Richmond, Va 23228 Owner- John Allen 804-269-6365 Class A License Insured |
| | |
| | #4 |
| Slacking off in the house Join Date: Aug 2007 Location: In IN
Posts: 217
Rep Power: 2 ![]() | they just need to be replaced. I haven't opened my dual door since May... it's just... busted. lol I dunno, we'll see what kind of tax refund I get this year *crosses fingers*
__________________ 1927 2200 sq feet 3 story renovation project. Done Washing Machine - 10.27.07 Windows Install - 02.13.08 (New) Gas Oven - 11.22.08 Needs to be Done Put in the (new) dryer Uh... Alot more. |
| | |