| | #71 |
| Administrator Join Date: Aug 2007 Location: Central CT Age: 32
Posts: 499
Rep Power: 10 ![]() | looks like a whole new room |
| | |
| | #72 |
| Senior Member Join Date: Aug 2007 Location: In Debt.
Posts: 252
Rep Power: 5 ![]() | Thats because it is... lol... And tomorrow morning i'm doing the window mouldings, baseboard mouldings, and debating on crown mouldings because I cant get the ceiling seams the way I would like them... And the new baseboard heaters... Then it is pretty much DONE. |
| | |
| | #73 |
| Administrator Join Date: Aug 2007 Location: Central CT Age: 32
Posts: 499
Rep Power: 10 ![]() | sweet. what's next? |
| | |
| | #74 |
| Senior Member Join Date: Aug 2007 Location: In Debt.
Posts: 252
Rep Power: 5 ![]() | After this room is done... recover from bills for a month or two... Then, the bathroom gets a new window (Same size as the windows this room got), new sink, vanity, tile floor, possibly toilet, & paint... Then after that, instead of replacing the back door & the window next to it seen here (Very old pic... from when I moved in). i'm taking them both out and putting in a sliding glass door... Then, that portion of the house will have its wainescoating removed & re-sheetrocked, as well as sheetrock ceiling to replace the drop paneling, and also going to try and widen that opening up to the ceiling assuming its not a load bearing header... If it is... We'll see... wow... just looking for some pics, came across what this room looked like when I moved in... Then after the baby remodel #1 |
| | |
| | #75 |
| Senior Member Join Date: Aug 2007 Location: In Debt.
Posts: 252
Rep Power: 5 ![]() | Sooo close!!! ![]() ![]() ![]() ![]() ![]() Tomorrow morning I just need to putty the moulding, then do 1 small piece of baseboard moulding, touch up a few paint spots, and its DONE.. (Except for ceiling cutting in, which i suck at, so my sister is doing saturday morning when she comes over to furnish & decorate the room)... Then Saturday night = DRUNK AND PARTY AT NOAHS HOUSE!!!! |
| | |
| | #76 |
| Senior Member Join Date: Aug 2007 Location: In Debt.
Posts: 252
Rep Power: 5 ![]() | ITS DONE!!! Welll.... 98% done... Its livable... The curtains need to be trimmed & i need to finish the closet, get the TV, and hang a few mirrors... ![]() ![]() ![]() ![]() ![]() Now, the room is finished... So today i started the next project... Pulled the motor out of the STi, and tomorrow mornign the heads come off and go to the machine shop, along with the flywheel, that is grooved from the SHOT CLUTCH... ![]() |
| | |
| | #77 |
| Igloo Architect Join Date: Aug 2007 Location: North Pole, AK Age: 28
Posts: 36
Rep Power: 0 ![]() | Is that one of those Chinese death cribs? |
| | |
| | #78 |
| Senior Member Join Date: Aug 2007 Location: In Debt.
Posts: 252
Rep Power: 5 ![]() | Nope... Thats one of those really expensive, solid wood, last your child until they are 6 cribs... Just before I put the mattress in... :P |
| | |